Click and lock flooring
Contents |
[edit] Introduction
The term ‘flooring’ refers to the lower enclosing surface of spaces within buildings. This may be part of the floor structure, such as the upper surface of a concrete slab or floor boards, but typically it is a permanent covering laid over the floor. There are many types of flooring materials available.
Click and lock flooring (also known as snap and lock flooring, lock flooring, drop and lock flooring, snap lock flooring or click together flooring) is a type of flooring that is primarily used on floating floors over subfloors. As a type of floating floor, click and lock floors are not fixed to the substrate layer below (which may be, for example, the structural floor, an underlay, an underfloor heating construction or acoustic or thermal insulation).
Floating floors are held in place by a combination of their own weight, the boundaries of the room in which they are laid, the fixings between the elements of the floating floor, and friction between the floating floor and the substrate. Floating floors are particularly common in refurbishment works, and can be used to help improve the thermal or acoustic insulation of a floor construction.
[edit] Fitting the boards together
Click and lock flooring can be manufactured in boards or planks of varying lengths and widths. It is most commonly produced in engineered wood, laminate and other materials such as cork, vinyl and engineered bamboo. Historically, it has not generally been used for solid hardwood flooring, although this is now becoming more widely available.
Engineered flooring typically consists of boards made up of three or four layers of laminated timber, held together at right angles by glue to create a plank typically of around 14mm thickness. Laminate flooring is a compressed fibreboard plank covered with an image of a material such as timber, stone, tiles and so on that is then given a protective coating.
These planks have specially milled tongue and groove (T&G) treatments on each edge. Angled tongue (male) projections are formed onto one edge of a board while a matching angled groove (female) recession is cut on the other edge. The tongue of one board fits into the groove of the adjoining board to form a strong, flush joint.
Tongue and groove joints are variations on the mortise and tenon joint, but instead of joining two pieces at a right angle (like a mortise and tenon joint), the tongue and groove connection creates a strong parallel joint. However, unlike basic tongue and groove flooring, click lock flooring joins at the interlocking edge and then gets snapped into place through the application of firm, downward pressure.
[edit] Installation
As click and lock products do not require glue or nails, they are popular options for do-it-yourself flooring installation. It is generally a fairly quick process that does not necessarily require a professional contractor.
An important part of the installation process is the preparation of the flooring surface. While it may or may not be necessary to remove old flooring, a suitable underlay should always be used. For noise reduction, it is advisable to use high quality underlay materials under click and lock flooring.
Since this installation method creates a floating surface, it is possible to put one floor on top of another, with underlay in between, as long as the surface is clean, flat and dry, and the subfloor is solid and jointless. It is not suitable for uneven wood floors or carpet.
Under the right conditions, a click and lock floor may be installed over the following surfaces:
- Concrete slab.
- Cork.
- Hardwood.
- Linoleum.
- Natural stone (if smooth).
- Oriented Strand Board (OSB) or particleboard.
- Plywood.
- Porcelain tile.
- Vinyl tiles, sheets or planks.
Before installation, materials should be given time to acclimatise to their environment. The unopened boxes can sit for 48 hours or more at normal room temperature to give them time to adjust. If the boards have not been given enough time to acclimatise, boards can buckle or gaps can develop. This problem can be resolved with a device called a floor gap fixer after the installation is complete, but it is advisable to take suitable precautions beforehand.
Next, it may be beneficial to arrange the materials on the floor in a mock up before installing them. While the click and lock method isn’t permanent, this planning step helps to anticipate cuts and adjustments created by the shape of the room or difficult areas around doors.
It is important to leave slight gaps between the floor and the wall for expansion once the boards are locked in place. This can be covered later with a profiled edge trim, or filled with a flexible filler.
[edit] Underfloor heating
Certain types of click and lock flooring (such as those suitable for transferring heat) can be installed over underfloor heating (UFH). Options include engineered flooring, bamboo and laminate.
UFH is a form of heating in which the floor surface of a space is heated and this heat is then radiated (and convected) throughout the space to create comfortable thermal conditions.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Open inquiry into the remediation of dangerous cladding
The committee wants to hear views in its call for evidence.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Refurbishment for net zero; the BSRIA white paper
The everyday practice of tackling energy efficiency, fabric first, ventilation, air quality, and occupant wellbeing.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Foundations for the Future: A new model for social housing
To create a social housing pipeline, that reduces the need for continuous government funding.
Mutual Investment Models or MIMs
PPP or PFI, enhanced for public interest by the Welsh Government.
Stress Awareness Week ends but employer legal duties continue.
A call to follow the five Rs for the business and for the staff.
Key points and relevance to construction of meeting, due to reconvene.
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?